New Building Plans

Welcome > Campus > Master Site Plan > Building Plans

See Current Construction Progress Photos right

Groundbreaking - June 29, 2008
The groundbreaking for our new School/Multipurpose wing took place on Sunday, June 29. An exciting day in the history and ministry of Holy Cross! In the photo is the Building Task Force and representatives from arcDesign and Pepper Construction. From left: Michelle Searcy, Greg Woods, Bill Drummond, Howard Schroeder, James Belange (Pepper Construction), Bob Snyder, Butch Adler (Pepper Construction), Greg Miller (arcDesign) Pastor John Sattler, Ken Miller.

Building Task Force at Groundbreaking
School Staff Breaking Ground

Ministry Expansion Summary 2008

Garage Renovation
The Faith Life Center North Garage will be renovated to become a School classroom for the 2008-2009 school year. After the new Education Center is finished, this classroom will be used as a multi-use meeting room for a variety of church & community needs. Work begins July 1, 2008.

Relocation of Classroom Suites
The Classroom Suites need to be relocated to make way for the new Education Center. They will be relocated to an area near the Faith Life Center, and also near the new classroom in the North Garage. That makes it possible for all the elementary grades can be together in the same area. To move the classrooms across the ditch between the properties, a ramp needs to be built. After the move, the ramp will be paved to allow access to the Faith Life Center driveway creating additional access to Oaklandon Road when leaving the parking lot. Relocation will begin in July 2008. (For Site Drawing Click Here)

Parking Lot Reconfiguration
The new Education Center will be located in a major portion of the smaller school parking lot. That requires reconfiguring the entire parking lot arrangement. The school lot will be extended to the east and the south with an additional drive extending along the east side of the building near the Commons Entrance door. (CLICK HERE). Parking lot renovations begin August 5 and continue through the early part of September 2008. Please be understanding of the inconveniences these improvements will make, and be willing to walk a little further than usual. (For Site Drawing Click Here)

Construction of Education Center
The new 2-story Education Center will include 6 additional classrooms, a multi-use/gymnasium space and some support space, as the first phase of a multiphase construction project that will eventually include 24 classrooms. Construction will begin in September 2008. See plans below.

Without Additional Debt!
The entire project is made possible through the contributions pledged and made to the “For Those 2 Come” Capital Campaign, without impacting the ministry budget. Thanks to everyone who made a pledge and for keeping up with your commitment.

 

See Current Construction Progress Photos right

longportletbar

Holy Cross is embarking on a bold adventure of faith as we expand our ministries and our facilities. The plans for the new school/multipurpose wing are below. Initial work will begin July 2008!
Click on any of the pictures for a larger view.

First Floor Plan sml

First Floor

Second Floor Plan sml

Second Floor

northElevation sml

Elevation Looking North

Current as of 4/1/08

Site Plan sml

Site Plan

Future Expansion

Future Expansion

Holy Cross Education Center Multipurpose

Interior Elevation of Multipurpose Space

Architectural work is being done by Mike Engledow of arcDesign.
Construction Consultation: Pepper Construction

Building Task ForceFor more information about these plans, contact a member of the Building Task Force:
Bob Snyder, chairman, Jeff Gerbers, Matt Hubbard, Ken Miller, Michelle Searcy, Blake Svendsen, Howard Schroeder, Greg Woods, Pastor John Sattler, Pastor Dave McClean.

left Back to Master Site Plan
left Back to Campus
left Back to Home Page

[Welcome] [School] [Campus] [Community] [Education] [Ministries] [News]

© 2008 Holy Cross Lutheran Church of Indianapolis, Indiana, USA. Contact Us